Baidyanath Asli Ayurved Nagpur Triphala Churna I Ayurvedic Remedy For Gastro-Intestinal Health - 500G
Stock Expiry Date*: 22-11-2027
100% Authentic — Sourced directly from manufacturers or their authorized dealers!
- TRADITIONAL AYURVEDIC FORMULA: Baidyanath Triphala Churna 500g is a classic Ayurvedic herbal blend composed of three fruits: Amalaki (Emblica officinalis), Bibhitaki (Terminalia bellirica), and Haritaki (Terminalia chebula).
- DIGESTIVE HEALTH SUPPORT: Triphala Churna is known for its gentle yet effective support for digestive health, promoting regularity and detoxification.; NATURAL DETOXIFIER: This herbal powder may aid in detoxifying the body by supporting healthy elimination and cleansing of the digestive tract.
- ANTIOXIDANT PROPERTIES: Triphala Churna is rich in antioxidants, which help protect cells from oxidative stress and support overall health and well-being.
- VERSATILE USE: Baidyanath Triphala Churna can be easily incorporated into your daily routine by mixing it with water, juice, or as directed by a healthcare professional
- Target Gender: Unisex
| Werkstoffen | Vitamine C, Triphala Churna, IRON & ZINC |
| Speciale ingrediënten | Vitamine C, TRIPHALA CHURNA, IRON & ZINC |
| Aanbevolen toepassingen voor product | Digestieve gezondheid, Ooggezondheid |
| Modelnaam | Vitamine C, Nagpur Triphala Churna, Iron & Zinc, Natural, Pack of 500 g |
| Afmetingen van het product | 500 g, 33 x 2.7 x 15.4 cm |
| Merk | Baidyanath Asli Ayurved |
| Smaak | Natuurlijk |
| Aantal eenheden | 500.0 Grams |
| Itemformulier | Poeder |
| Itemgewicht | 500 Gram |
| Productvoordelen | Digestieve gezondheidsondersteuning |
| Leeftijdscategorie (beschrijving) | Volwassenen |
| Aantal items | 1 |
| Primair supplementtype | Kruidensupplement |
| Inbegrepen componenten | BAIDYANATH ASLI AYURVED |
| Fabrikant | Siddhayu Ayurvedic Research Foundation Private Liited, Siddhayu Ayurvedic Research Foundation Private Liited |
| Itemafmetingen L x B x H | 33 x 2.7 x 15.4 Centimeters |
| Productsoort | Triphala |
| Leeftijdsklassebeschrijving | Volwassenen |
| Containertype | Verpakking |
| Fabrikant Deelnummer | BN_TRCHURNA_500 |
| Materiaalkenmerken | Geen kunstmatige smaakstoffen |
| Datum eerst beschikbaar | 24 June 2021 |
| Modelnummer | BN_TRCHURNA_500 |
| Item Afmetingen | 33 x 2.7 x 15.4 Centimeters |
| Item Nype naam | Baidyanath Nagpur Triphala Churna I Vitamin C I Iron & Zinc I 500 gms |
| Artikelmodelnummer | BN_TRCHURNA_500 |
| Smaak | Natuurlijk |
| Colour | Natural |
| Fabrikant Contactinformatie | Siddhayu Ayurvedic Research Foundation Private Liited |
| Itemmaten LxBxH | 33 x 2.7 x 15.4 Centimeters |
| Country of Origin | India |
| Packer Contact Information | Siddhayu Ayurvedic Research Foundation Private Liited |
| Net Quantity | 500.0 Grams |
| Packer | Siddhayu Ayurvedic Research Foundation Private Liited |
| Generic Name | Baidyanath Nagpur Triphala Churna I Vitamin C I Iron & Zinc I 500 gms |
-
Krijg 5% korting bij aankoop van 4 of meer artikelen
-
Krijg 5% korting op uw volgende aankoop.
-
Bestellingen worden verwerkt en verzonden vanuit Brooklyn, VS.
-
Gratis levering op kwalificerende bestellingen.
3–6 dagen (Binnenlands).
30-Dagen Retourgarantie
Aankopen met vertrouwen, met 30 dagen retourondersteuning.
SKU |
BRSW2ZI2DICQK3DB |
Categorie |
Voeding , Vitamins, Minerals & Supplements , Herbal Supplements , Triphala |
Tags |
Estimated shipping
Select a product to estimate shipping.Baidyanath Triphala Churna 500 g is an incredible natural cure that comprises of Haritaki, Bibhitaki and amalaki. Base, salt and acid blended powder is warm in nature, digestible, tasteful and enhances the hunger.
Product Dimensions
33 x 2.7 x 15.4 cm; 500 g
Product details





Shipping & Delivery
At Nutricity, we aim to deliver your order as quickly and safely as possible.
Domestic Shipping :
Orders are typically delivered within 3–6 business days.
International Shipping:
Estimated delivery time is 12–26 business days, depending on the destination and customs processing.
You will receive a tracking number once your order has been dispatched. Delivery times may vary during holidays or due to unforeseen delays.
Recently tracked orders
| Order Number | Carrier | Final Mile Tracking Code | Last Update | Track |
|---|---|---|---|---|
| NC32143 | Gls Group | 984231631518 | 2026-10-13 | Track |
| NC31992 | Gls Group | 984231631525 | 2026-10-13 | Track |
| NC31743 | Gls Group | 984231624749 | 2026-10-12 | Track |
| NC31191 | Gls Group | 984230890374 | 2026-10-06 | Track |
| NC27496 | Gls Group | 984230864986 | 2026-09-25 | Track |
| NC27020 | Gls Group | 984230856417 | 2026-09-22 | Track |
| NC23262 | Gls Group | 984230260399 | 2026-09-02 | Track |
| NC21144 | Trackyourparcel | 3SABCM108198244 | 2026-08-24 | Track |
| NC20346 | Gls Group | 984230004795 | 2026-08-07 | Track |
| NC19314 | Trackyourparcel | 3SABCM108237853 | 2026-09-05 | Track |
Disclaimer
Voedingssupplementen zijn geen medicijnen. Producten die op deze website worden verkocht, zijn niet bedoeld om enige ziekte te diagnosticeren, te behandelen, te genezen of te voorkomen. Als u een medische aandoening heeft, raadpleeg dan altijd een gekwalificeerde zorgprofessional voordat u het gebruikt. Individuele resultaten kunnen variëren. Door een bestelling te plaatsen, stemt u ermee in de invoerregels van uw land na te leven. Wij dekken de toepasselijke douanerechten en belastingen waar vermeld.
*Informatie over de vervaldatum:
Gelieve op te merken dat de vervaldatum kan variëren van batch tot batch. We garanderen echter dat alle producten die naar onze klanten worden verzonden een geldige houdbaarheid hebben en niet verlopen zijn op het moment van levering.









